Water resources
Roaring Fork Engineering provided construction observation, inspection, and field-adjusted foundation design for the full reconstruction of a jurisdictional dam. Having engineers on site let us respond to changing foundation conditions and meet Regional Dam Safety Engineer requirements.
Challenges & highlights
The dam sits close to the Roaring Fork River, and the foundation conditions reflected that. The ground changed quickly between bedrock, alluvial cobble, and pockets of sand, and none of this was accounted for in the original design. Our team made numerous field changes to the foundation design during construction so the dam would meet the requirements of the Regional Dam Safety Engineer.
On-site observation and inspection were central to our role. Construction of a jurisdictional dam requires close oversight, and having engineers in the field allowed the team to respond to conditions as they were uncovered.
The results
The Ruby Pond dam was rebuilt successfully and meets all Regional Dam Safety Engineer requirements, thanks to close coordination among the developer, contractor, regulator, and our on-site engineers. When foundation conditions differed from the original design, our team worked through field changes in real time so the project stayed on track and in compliance. The new dam is safe and properly engineered, and it supports the owner’s plans for a swimming and fire pit feature in the pond.
Location: Red Mountain, Aspen, CO
Infrastructure that lasts
Whether you’re planning a new development, upgrading public infrastructure, or improving community systems, our team is ready to help bring your project from concept to completion.